A trailer chassis was built for a 16 foot long unit to carry large portable kitchen. We are able to supply chassis ranging from 16 to 20 feet in length.
CASE STUDY 2
Project:
Forklift site box
Location:
London
Work carried out:
A site box was built to allow tools to be lifted to higher levels on a site. There is a drop down front for easy access.
CASE STUDY 3
Project:
Advance Blast
Location:
Reading
Work carried out:
We built a secure aluminium tool vault with lockable doors.
CASE STUDY 4
Project:
Water Maiden
Location:
Reading
Work carried out:
In Reading we fabricated a galvanised weir tank for site water purification.
CASE STUDY 5
Project:
Condenser
inspection gantry
Location:
Tilbury, Essex
Work carried out:
The whole structure was pre-engineered off site and then installed in one day. The picture below shows the site before work began and the picture, below right, the extent of the work carried out.
CASE STUDY 6
Project:
Access staircase
Location:
Eastleigh
Work carried out:
We constructed an impressive access staircase with open deck flooring. The whole structure was fabricated on site.
CASE STUDY 7
Project:
Condenser Platform
Location:
Taunton, Devon
Work carried out:
The condenser platform was fabricated off site then transported and erected in one day to minimise disruption.
CASE STUDY 8
Project:
Thames Valley RaceTech
Sports Car Garage
Location:
Sonning Common
Work carried out:
We supplied the steel frame for the complete building and supplied and erected the internal mezzanine structure.
CASE STUDY 9
Project:
Air conditioner support platform
Location:
Reading, Berkshire
Work carried out:
We fabricated the support structure which was fully suspended from the wall. We then finished off by cladding over the platform. See photo bottom right.